NSZ/NDZ INDOOR SPLIT INSTALLATION MANUAL
The Envision series comes with a holding charge. The
charge must be adjusted in the field based on performance.
Refrigeration piping on the split consists of installing a
brazed copper line set between the blower coil unit and the
unit’s split compressor section. To select the proper tube
diameters for the installation, refer to the Line Set Sizes
table. Line sets over 60 feet long are not recommended
because of oil return and pressure drop problems. The
suction line must always be insulated. Handle and route the
line sets carefully to avoid kinking or bending the tubes. If
the line set is kinked or distorted and it cannot be formed
back into its original shape, the bad portion of the pipe
should be replaced. A restricted line set will affect the
performance of the system.
Fasten the copper line set to the blower coil unit as
instructed by the coil installation instructions shown in
Refrigeration
Replace caps after
opening system
Service ports for
attaching refrigerant
gauges
Insulated
Suction Line
Braze
Connection
Liquid
Line
ccw
ccw
Figure 13: Typical Split System Refrigerant Line
Connections
Position Description System
Service
Port
CW - Full In Shipping Position Closed Open
CCW - Full Out 1/2 turn CW Service Position Open Open
CCW - Full Out Operation Position Open Closed
TXV ("IN" toward condensing unit)
Equalizer
Bulb
Suction
Liquid
TXV has internal check valve
Figure 14: Attaching the Air Coil
Figure 14. Nitrogen should be bled through the system at 2
to 3 PSI to prevent oxidation inside the refrigerant tubing.
Use a low silver phos-copper braze alloy on all brazed
connections.
Braze line set to the service valve stubs on the outside
front of the split cabinet as shown in Figure 13. Nitrogen
should be bled through the system at 2 to 3 PSI to prevent
oxidation contamination. Use a low silver phos-copper
braze alloy on all brazed connections. Envision split units
are shipped with a factory charge and service valves are not
to be opened until the line set has been leak tested, purged
and evacuated. Schrader cores should be removed before
brazing. A heat sink should be used on the service valves
and TXV to prevent damage caused by excessive heat.